top of page
CONTINUED
DEEP WELL 2022
In January 2022 we developed a newer system for the tube deep which included the usage if an electric pump with water storage tank.
The benefit to this is that it allows instant access to fresh, clean water without the need to pump for water. This advancement means the process for collecting water is much quicker and less labour intensive.
Use the arrow on the image gallery to view the photos of the project including before & after photos.
1/1
Guftor Gow Madrassa
South Surma
1/3
Tuker Bazar
Jalalabad
1/4
Bonduwa Village
Biswanath
1/4
Kamal Bazar
South Surma
WhatsApp Image 2021-02-04 at 9.43.05 AM (2)
1/4
Goripur Village
Jalalabad
Nuwagow Madrasa
Jalalabad
1/3
1/3
Hawsha Jame Masjid
Jalalabad
1/3
Kazirgow Village
Jalalabad
1/4
Purbo Jagail village
Jalalabad
Bolaura Bazar
Jalalabad
1/3
1/3
bottom of page